Project: 20-SP-024 TOA VACA WATER TREATMENT PLANT NEW PRE-SEDIMENTATION TANK (PROJECT COMPLETION), VILLALBA

Project Description

This project consists of the construction of a new 7.5 MGD Cascade Aerator and a new 7.5 MGD Pre-SedimentationBasin with flocculation, both before the existing rapid mixing chamber at the existing Toa Vaca Water Treatment Plant. Also, the construction of a Sludge Transfer Pump Station including submersible pumps, piping, electrical work, etc. All in accordance to the Construction Drawings and specifications prepared by the PRASA. This project will benefit approximately 40,000 families in the Municipalities of Villalba, Juana Díaz, Coamo, Santa Isabel and Ponce.