Project: 20-SP-017 NEW DORADO TRUNK SEWER

Project Description

The Puerto Rico Aqueduct and Sewer Authority propose to improve the Dorado Trunk Sewer that reaches the Dorado Wastewater Treatment Plant. This trunk sewer is known to be overloaded and cause wastewater overflows. Additionally, the conditions of the existing trunk sewer has prohibited or increased the cost of new developments connection to the existing sewer system, by requiring pump station with direct conveyance to the Dorado WWTP. All in accordance to scope of work and specifications prepared by PRASA. This project will benefit approximately 21,108 families in the Municipality of Dorado.