Project: 19-SP-002 DESIGN & BUILD FOR THE TEMPORARY GUAJATACA DAM FLOATING PUMP STATION, ISABELA

Project Description

The project consists of a design and build for a floating pumping station in the Guajataca Dam to assure the required raw water supply for the PRASA Water Filtration Plants that depend of this source through the Derivation Channel and Guajataca River, all according to the scope of work and specifications prepared by the PRASA. This project will benefit approximately 71,714 families in the municipalities of Isabela, San Sebastián, Aguadilla, Aguada, Moca, Rincón, Quebradillas y Camuy.

Announcements